This is dealt with in Item 6.

33. Extra labour and material in forming casings for

pipes in tile dados.

This work has been measured and included in

final account excepting labour in notching

tiles for screws 14" diameter.

No. 168. Cutting circular notches on tiles

@ .15 . 25.20

GT.V

UP.S

fanit ni bowɑILA trucos

TOJURIJLOù of evi

.ostib *48

OA.S-

SY

02. g 8 .of!

Luit ni bowoIIA $10/0008

30.12.

TOJQUIJHOg at ev

.033ib "48

08.01-

da. # AS .ol

Lanit ni bowolfA

Jrwoo

TOJURIJNO) oð ayɑ

al.......

.Javobus Lanit end mi bejimo need even jaiwollot edt saqiq bıal of vino gaivit solutiot Babid "48

ajniol bedimo bam beyżw lİJİN

{

00.08 -

03.e

00.0S

.08.20

05. I 3 AS .ol!

ob

.ob

03.13 .ol

⚫ob

.ob

"S

00.1 9 0% .olf

TOJONIJNOƉoð svű

Due to Contractor

..825.20

34. Alteration to brick walls between Corridor and

N.E. & N.T. ataire.

This work has been measured and adjusted on

Variation Order No. 9.

No extra is due to Contractor.

35. Corbelling out for plaster cornice to Ground floor

corridors.

Already adjusted on Variation Order No. 27.

No extra is due to Contractor.

Extra work done on 37 Variation Orders referred to

in Contractors' letter dated 17th.

October. 1913.

The work on these Orders has been allowed for in the final

account with the following exceptions.

Variation

Order No.2 Extra arches.

Centering for arches amounting to 91 feet

super has been omitted,

101 .53 8x00ft ateromoo ni nelod gridJNO

00.CTER...

„EMIJJIŤ JAZİN DİN¢56İN

BIJZO un brʊ JUNIJHOë në Tot bebivorq ai xrow aidT

.IƐ meti

Amount due to Contractor iɛ....

..825.48

4. Staining frames.

Not included in the final account.

.eldiesLuba ni

pied eslommig ♪ to egot out zot beden si Hadri

.esia gymni to snoje eno mi fone

.SE

The quantity amounts to 650 yds. super.

Amount due to Contractor is.

.765.00

12. Breeze bricks.

The proportionate rate to that in the Contract is

70